KENTUCKY TRANSPORTATION CABINET
| Contract ID | 264511 | Primary Project Number | 0301601852601 |
| Contract Description | REEDYVILLE RD (KY 185) | ||
| Primary County | BUTLER | Fed/St Number | 121GR26T003-HSIP |
| Vendor ID | 02519 | Vendor Name | SCOTTY'S CONTRACTING & STONE LLC |
| Bid Amount | $ 4,997,011.91 | ||
| SM- Project | 0301601852601 |
| Fed/State Number | HSIP 5074(009) |
| Project Description | REEDYVILLE RD (KY 185) |
| *********** |
| SM- Project | 0301601852601 | CATEGORY NUMBER | 0001 | CATEGORY Description | PAVING |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0365 | DGA BASE | 00001 | 798.000 |
798.000 |
$50.840 |
TON | 0.8 |
| 0370 | ASPHALT SEAL AGGREGATE | 00100 | 84.000 |
84.000 |
$287.560 |
TON | 0.5 |
| 0375 | ASPHALT SEAL COAT | 00103 | 10.000 |
10.000 |
$1,289.500 |
TON | 0.3 |
| 0380 | LEVELING & WEDGING PG64-22 | 00190 | 1,080.000 |
1,080.000 |
$145.470 |
TON | 3.1 |
| 0385 | CL3 ASPH BASE 1.00D PG64-22 | 00214 | 32.000 |
32.000 |
$277.010 |
TON | 0.2 |
| 0390 | CL3 ASPH SURF 0.38D PG64-22 | 00339 | 1,581.000 |
1,581.000 |
$108.790 |
TON | 3.4 |
| 0395 | ASPHALT PAVE MILLING & TEXTURING | 02677 | 663.000 |
663.000 |
$50.250 |
TON | 0.7 |
| 0400 | BASE FAILURE REPAIR | 03240 | 1,694.000 |
1,694.000 |
$134.420 |
SQYD | 4.6 |
| 0405 | ASPHALT MATERIAL FOR TACK NON-TRACKING | 24970EC | 12.000 |
12.000 |
$626.730 |
TON | 0.2 |
Category Total $684,133.26 |
| SM- Project | 0301601852601 | CATEGORY NUMBER | 0002 | CATEGORY Description | ROADWAY |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0410 | DELINEATOR FOR G/R BI DIRECTIONAL WHITE | 01987 | 117.000 |
117.000 |
$14.750 |
EACH | 0.0 |
| 0415 | TEMP DITCH | 02159 | 8,805.000 |
8,805.000 |
$0.010 |
LF | 0.0 |
| 0420 | CLEAN TEMP DITCH | 02160 | 4,402.000 |
4,402.000 |
$0.010 |
LF | 0.0 |
| 0425 | EMBANKMENT IN PLACE | 02230 | 6,551.000 |
6,551.000 |
$75.550 |
CUYD | 9.9 |
| 0430 | G/R-STEEL W BEAM-S FACE A | 02355 | 100.000 |
100.000 |
$64.780 |
LF | 0.1 |
| 0435 | G/R TERMINAL SECTION NO 1 | 02360 | 16.000 |
16.000 |
$88.510 |
EACH | 0.0 |
| 0440 | G/R END TREATMENT TYPE 1 | 02367 | 4.000 |
4.000 |
$3,506.630 |
EACH | 0.3 |
| 0445 | G/R END TREATMENT TYPE 2A | 02369 | 1.000 |
1.000 |
$1,906.860 |
EACH | 0.0 |
| 0450 | REMOVE G/R | 02381 | 5,034.000 |
5,034.000 |
$3.670 |
LF | 0.4 |
| 0455 | G/R END TREATMENT TYPE 4A | 02391 | 1.000 |
1.000 |
$3,789.400 |
EACH | 0.1 |
| 0460 | CHANNEL LINING CLASS II | 02483 | 100.000 |
100.000 |
$91.980 |
TON | 0.2 |
| 0465 | TEMPORARY SIGNS | 02562 | 500.000 |
500.000 |
$8.080 |
SQFT | 0.1 |
| 0470 | MAINTAIN & CONTROL TRAFFIC BUTLER KY 185 HSIP | 02650 | 1.000 |
1.000 |
$229,105.750 |
LS | 4.6 |
| 0475 | PORTABLE CHANGEABLE MESSAGE SIGN | 02671 | 4.000 |
4.000 |
$8,546.250 |
EACH | 0.7 |
| 0480 | MOBILIZATION FOR MILL & TEXT BUTLER KY 185 HSIP | 02676 | 1.000 |
1.000 |
$7,061.390 |
LS | 0.1 |
| 0485 | EDGELINE RUMBLE STRIPS | 02697 | 23,000.000 |
23,000.000 |
$0.270 |
LF | 0.1 |
| 0490 | TEMP SILT FENCE | 02701 | 8,805.000 |
8,805.000 |
$7.800 |
LF | 1.4 |
| 0495 | SILT TRAP TYPE A | 02703 | 9.000 |
9.000 |
$328.950 |
EACH | 0.1 |
| 0500 | SILT TRAP TYPE B | 02704 | 9.000 |
9.000 |
$330.030 |
EACH | 0.1 |
| 0505 | SILT TRAP TYPE C | 02705 | 9.000 |
9.000 |
$328.950 |
EACH | 0.1 |
| 0510 | CLEAN SILT TRAP TYPE A | 02706 | 9.000 |
9.000 |
$0.010 |
EACH | 0.0 |
| 0515 | CLEAN SILT TRAP TYPE B | 02707 | 9.000 |
9.000 |
$0.010 |
EACH | 0.0 |
| 0520 | CLEAN SILT TRAP TYPE C | 02708 | 9.000 |
9.000 |
$0.010 |
EACH | 0.0 |
| 0525 | STAKING BUTLER KY 185 HSIP | 02726 | 1.000 |
1.000 |
$75,331.490 |
LS | 1.5 |
| 0530 | TRIM & REMOVE TREES & BRUSH | 03269 | 3,230.000 |
3,230.000 |
$18.400 |
LF | 1.2 |
| 0535 | TEMP SIGNAL 2 PHASE (ADDED 3-16-26) | 04933 | 1.000 |
1.000 |
$36,919.800 |
EACH | 0.7 |
| 0540 | EROSION CONTROL BLANKET | 05950 | 20,038.000 |
20,038.000 |
$1.750 |
SQYD | 0.7 |
| 0545 | TEMP MULCH | 05952 | 26,087.000 |
26,087.000 |
$0.200 |
SQYD | 0.1 |
| 0550 | TEMP SEEDING AND PROTECTION | 05953 | 19,566.000 |
19,566.000 |
$0.300 |
SQYD | 0.1 |
| 0555 | INITIAL FERTILIZER | 05963 | 2.000 |
2.000 |
$1,500.000 |
TON | 0.1 |
| 0560 | MAINTENANCE FERTILIZER | 05964 | 1.200 |
1.200 |
$1,500.000 |
TON | 0.0 |
| 0565 | SEEDING AND PROTECTION | 05985 | 19,566.000 |
19,566.000 |
$0.450 |
SQYD | 0.2 |
| 0570 | PAVE STRIPING-TEMP PAINT-4 IN | 06510 | 15,374.000 |
15,374.000 |
$0.300 |
LF | 0.1 |
| 0575 | PAVE STRIPING-THERMO-6 IN W | 06542 | 23,000.000 |
23,000.000 |
$1.300 |
LF | 0.6 |
| 0580 | PAVE STRIPING-THERMO-6 IN Y | 06543 | 23,000.000 |
23,000.000 |
$1.300 |
LF | 0.6 |
| 0585 | PAVE STRIPING-THERMO-12 IN W | 06546 | 60.000 |
60.000 |
$12.000 |
LF | 0.0 |
| 0590 | FOUNDATION PREPARATION BUTLER KY 185 HSIP | 08003 | 1.000 |
1.000 |
$187,233.170 |
LS | 3.7 |
| 0595 | CYCLOPEAN STONE RIP RAP | 08019 | 30.000 |
30.000 |
$75.000 |
TON | 0.0 |
| 0600 | CONCRETE-CLASS A | 08100 | 118.100 |
118.100 |
$2,800.000 |
CUYD | 6.6 |
| 0605 | STEEL REINFORCEMENT | 08150 | 15,290.000 |
15,290.000 |
$2.170 |
LB | 0.7 |
| 0610 | G/R-BRIDGE CASE I | 08805 | 100.000 |
100.000 |
$124.310 |
LF | 0.2 |
| 0615 | FUEL ADJUSTMENT | 10020NS | 6,190.000 |
6,190.000 |
$1.000 |
DOLL | 0.1 |
| 0620 | ASPHALT ADJUSTMENT | 10030NS | 15,548.000 |
15,548.000 |
$1.000 |
DOLL | 0.3 |
| 0625 | OBJECT MARKER TY 3 | 20191ED | 5.000 |
5.000 |
$24.630 |
EACH | 0.0 |
| 0630 | SOIL NAIL WALL | 20603ED | 3,000.000 |
3,000.000 |
$119.980 |
SQFT | 7.2 |
| 0635 | REMOVE-STORE AND REINSTALL SIGN | 21134ND | 21.000 |
21.000 |
$569.680 |
EACH | 0.2 |
| 0640 | LONGITUDINAL EDGE KEY | 21289ED | 5,834.000 |
5,834.000 |
$6.820 |
LF | 0.8 |
| 0645 | G/R STEEL W BEAM-S FACE (7 FT POST) | 21802EN | 5,339.000 |
5,339.000 |
$34.940 |
LF | 3.7 |
| 0650 | ELECTRONIC DELIVERY MGMT SYSTEM - AGG | 26248EC | 1.000 |
1.000 |
$0.010 |
LS | 0.0 |
Category Total $2,392,692.71 |
| SM- Project | 0301601852601 | CATEGORY NUMBER | 0003 | CATEGORY Description | DRAINAGE |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0655 | ENTRANCE PIPE-15 IN | 00440 | 30.000 |
30.000 |
$118.240 |
LF | 0.1 |
| 0660 | CULVERT PIPE-18 IN | 00462 | 74.000 |
74.000 |
$345.140 |
LF | 0.5 |
| 0665 | CULVERT PIPE-24 IN | 00464 | 290.000 |
290.000 |
$435.360 |
LF | 2.5 |
| 0670 | CULVERT PIPE-30 IN | 00466 | 42.000 |
42.000 |
$457.710 |
LF | 0.4 |
| 0675 | PIPE CULVERT HEADWALL-30 IN | 01210 | 1.000 |
1.000 |
$4,320.000 |
EACH | 0.1 |
| 0680 | REMOVE PIPE | 01310 | 284.000 |
284.000 |
$48.700 |
LF | 0.3 |
| 0685 | METAL END SECTION TY 2-18 IN | 01381 | 1.000 |
1.000 |
$3,000.000 |
EACH | 0.1 |
| 0690 | REMOVE HEADWALL CULVERT PIPE | 02625 | 12.000 |
12.000 |
$1,900.920 |
EACH | 0.5 |
| 0695 | REMOVE HEADWALL RCBC | 02625 | 9.000 |
9.000 |
$1,500.000 |
EACH | 0.3 |
| 0700 | CLEAN PIPE STRUCTURE | 03262 | 7.000 |
7.000 |
$1,200.000 |
EACH | 0.2 |
| 0705 | PIPELINE INSPECTION | 24814EC | 1,292.000 |
1,292.000 |
$2.350 |
LF | 0.1 |
| 0710 | SLOPED AND MITERED HEADWALL-18 IN | 26131ED | 2.000 |
2.000 |
$3,000.000 |
EACH | 0.1 |
| 0715 | SLOPED AND MITERED HEADWALL-24 IN | 26132ED | 12.000 |
12.000 |
$3,800.000 |
EACH | 0.9 |
| 0720 | SLOPED AND MITERED HEADWALL-30 IN | 26133ED | 1.000 |
1.000 |
$4,000.000 |
EACH | 0.1 |
Category Total $299,063.82 |
| SM- Project | 0301601852601 | CATEGORY NUMBER | 0004 | CATEGORY Description | DEMOBILIZATION |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0725 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$24,509.120 |
LS | 0.5 |
Category Total $24,509.12 |
| SM- Project | 0303101852601 |
| Fed/State Number | HSIP 5074(009) |
| Project Description | REEDYVILLE RD (KY 185) |
| *********** |
| SM- Project | 0303101852601 | CATEGORY NUMBER | 0001 | CATEGORY Description | PAVING |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0005 | DGA BASE | 00001 | 329.000 |
329.000 |
$50.840 |
TON | 0.3 |
| 0010 | ASPHALT SEAL AGGREGATE | 00100 | 36.000 |
36.000 |
$287.560 |
TON | 0.2 |
| 0015 | ASPHALT SEAL COAT | 00103 | 4.000 |
4.000 |
$1,289.500 |
TON | 0.1 |
| 0020 | LEVELING & WEDGING PG64-22 | 00190 | 4.000 |
4.000 |
$145.470 |
TON | 0.0 |
| 0025 | CL3 ASPH BASE 1.00D PG64-22 | 00214 | 32.000 |
32.000 |
$277.010 |
TON | 0.2 |
| 0030 | CL3 ASPH SURF 0.38D PG64-22 | 00339 | 578.000 |
578.000 |
$108.790 |
TON | 1.3 |
| 0035 | ASPHALT PAVE MILLING & TEXTURING | 02677 | 13.000 |
13.000 |
$50.250 |
TON | 0.0 |
| 0040 | BASE FAILURE REPAIR | 03240 | 28.000 |
28.000 |
$134.420 |
SQYD | 0.1 |
| 0045 | ASPHALT MATERIAL FOR TACK NON-TRACKING | 24970EC | 4.000 |
4.000 |
$626.730 |
TON | 0.1 |
Category Total $111,487.27 |
| SM- Project | 0303101852601 | CATEGORY NUMBER | 0002 | CATEGORY Description | ROADWAY |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0050 | DELINEATOR FOR G/R BI DIRECTIONAL WHITE | 01987 | 36.000 |
36.000 |
$14.750 |
EACH | 0.0 |
| 0055 | TEMP DITCH | 02159 | 3,431.000 |
3,431.000 |
$0.010 |
LF | 0.0 |
| 0060 | CLEAN TEMP DITCH | 02160 | 1,715.000 |
1,715.000 |
$0.010 |
LF | 0.0 |
| 0065 | EMBANKMENT IN PLACE | 02230 | 2,621.000 |
2,621.000 |
$75.550 |
CUYD | 4.0 |
| 0070 | FENCE-TEMP | 02259 | 589.000 |
589.000 |
$2.830 |
LF | 0.0 |
| 0075 | REMOVE & REPLACE FENCE | 02268 | 589.000 |
589.000 |
$4.040 |
LF | 0.0 |
| 0080 | G/R TERMINAL SECTION NO 1 | 02360 | 4.000 |
4.000 |
$88.510 |
EACH | 0.0 |
| 0085 | REMOVE G/R | 02381 | 1,711.000 |
1,711.000 |
$3.670 |
LF | 0.1 |
| 0090 | CHANNEL LINING CLASS II | 02483 | 100.000 |
100.000 |
$91.980 |
TON | 0.2 |
| 0095 | TEMPORARY SIGNS | 02562 | 150.000 |
150.000 |
$8.080 |
SQFT | 0.0 |
| 0100 | MAINTAIN & CONTROL TRAFFIC EDMONSON KY 185 HSIP | 02650 | 1.000 |
1.000 |
$135,323.700 |
LS | 2.7 |
| 0105 | MOBILIZATION FOR MILL & TEXT EDMONSON KY 185 HSIP | 02676 | 1.000 |
1.000 |
$785.220 |
LS | 0.0 |
| 0110 | EDGELINE RUMBLE STRIPS | 02697 | 9,010.000 |
9,010.000 |
$0.270 |
LF | 0.0 |
| 0115 | TEMP SILT FENCE | 02701 | 3,431.000 |
3,431.000 |
$7.800 |
LF | 0.5 |
| 0120 | SILT TRAP TYPE A | 02703 | 3.000 |
3.000 |
$328.950 |
EACH | 0.0 |
| 0125 | SILT TRAP TYPE B | 02704 | 3.000 |
3.000 |
$330.030 |
EACH | 0.0 |
| 0130 | SILT TRAP TYPE C | 02705 | 3.000 |
3.000 |
$328.950 |
EACH | 0.0 |
| 0135 | CLEAN SILT TRAP TYPE A | 02706 | 3.000 |
3.000 |
$0.010 |
EACH | 0.0 |
| 0140 | CLEAN SILT TRAP TYPE B | 02707 | 3.000 |
3.000 |
$0.010 |
EACH | 0.0 |
| 0145 | CLEAN SILT TRAP TYPE C | 02708 | 3.000 |
3.000 |
$0.010 |
EACH | 0.0 |
| 0150 | TRIM & REMOVE TREES & BRUSH | 03269 | 535.000 |
535.000 |
$18.400 |
LF | 0.2 |
| 0155 | EROSION CONTROL BLANKET | 05950 | 7,623.000 |
7,623.000 |
$1.750 |
SQYD | 0.3 |
| 0160 | TEMP MULCH | 05952 | 10,164.000 |
10,164.000 |
$0.200 |
SQYD | 0.0 |
| 0165 | TEMP SEEDING AND PROTECTION | 05953 | 7,623.000 |
7,623.000 |
$0.300 |
SQYD | 0.0 |
| 0170 | INITIAL FERTILIZER | 05963 | 0.800 |
0.800 |
$1,500.000 |
TON | 0.0 |
| 0175 | MAINTENANCE FERTILIZER | 05964 | 0.500 |
0.500 |
$1,500.000 |
TON | 0.0 |
| 0180 | SEEDING AND PROTECTION | 05985 | 7,623.000 |
7,623.000 |
$0.450 |
SQYD | 0.1 |
| 0185 | PAVE STRIPING-THERMO-6 IN W | 06542 | 9,010.000 |
9,010.000 |
$1.300 |
LF | 0.2 |
| 0190 | PAVE STRIPING-THERMO-6 IN Y | 06543 | 9,010.000 |
9,010.000 |
$1.300 |
LF | 0.2 |
| 0195 | FOUNDATION PREPARATION EDMONSON KY 185 HSIP | 08003 | 1.000 |
1.000 |
$137,233.170 |
LS | 2.7 |
| 0200 | CYCLOPEAN STONE RIP RAP | 08019 | 11.000 |
11.000 |
$75.000 |
TON | 0.0 |
| 0205 | CONCRETE-CLASS A | 08100 | 140.100 |
140.100 |
$2,800.000 |
CUYD | 7.9 |
| 0210 | STEEL REINFORCEMENT | 08150 | 17,917.000 |
17,917.000 |
$2.170 |
LB | 0.8 |
| 0215 | REMOVE-STORE AND REINSTALL SIGN | 21134ND | 5.000 |
5.000 |
$569.680 |
EACH | 0.1 |
| 0220 | G/R STEEL W BEAM-S FACE (7 FT POST) | 21802EN | 1,740.000 |
1,740.000 |
$34.940 |
LF | 1.2 |
Category Total $1,077,128.51 |
| SM- Project | 0303101852601 | CATEGORY NUMBER | 0003 | CATEGORY Description | DRAINAGE |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0225 | ENTRANCE PIPE-15 IN | 00440 | 24.000 |
24.000 |
$118.240 |
LF | 0.1 |
| 0230 | CULVERT PIPE-18 IN | 00462 | 296.000 |
296.000 |
$345.140 |
LF | 2.0 |
| 0235 | CULVERT PIPE-24 IN | 00464 | 41.000 |
41.000 |
$435.360 |
LF | 0.4 |
| 0240 | PIPE CULVERT HEADWALL-18 IN | 01204 | 1.000 |
1.000 |
$3,240.000 |
EACH | 0.1 |
| 0245 | REMOVE PIPE | 01310 | 279.000 |
279.000 |
$48.700 |
LF | 0.3 |
| 0250 | SAFETY BOX INLET-18 IN SDB-1 | 01726 | 3.000 |
3.000 |
$6,000.000 |
EACH | 0.4 |
| 0255 | SAFETY BOX INLET-18 IN DBL SDB-5 | 01728 | 1.000 |
1.000 |
$7,500.000 |
EACH | 0.2 |
| 0260 | SAFETY BOX INLET-24 IN DBL SDB-5 | 01729 | 1.000 |
1.000 |
$8,500.000 |
EACH | 0.2 |
| 0265 | REMOVE HEADWALL CULVERT PIPE | 02625 | 13.000 |
13.000 |
$1,900.920 |
EACH | 0.5 |
| 0270 | REMOVE HEADWALL RCBC | 02625 | 9.000 |
9.000 |
$1,500.000 |
EACH | 0.3 |
| 0275 | SAFELOADING | 02690 | 2.200 |
2.200 |
$1,000.000 |
CUYD | 0.0 |
| 0280 | CLEAN PIPE STRUCTURE | 03262 | 1.000 |
1.000 |
$1,200.000 |
EACH | 0.0 |
| 0285 | SLOPED AND MITERED HEADWALL-18 IN | 26131ED | 9.000 |
9.000 |
$3,000.000 |
EACH | 0.5 |
| 0290 | SLOPED AND MITERED HEADWALL-24 IN | 26132ED | 1.000 |
1.000 |
$3,800.000 |
EACH | 0.1 |
Category Total $246,088.22 |
| SM- Project | 0303101852601 | CATEGORY NUMBER | 0004 | CATEGORY Description | DEMOBILIZATION |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0295 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$24,509.130 |
LS | 0.5 |
Category Total $24,509.13 |
| SM- Project | MP01601852601 |
| Fed/State Number | FD05 016 0185 006-008 |
| Project Description | REEDYVILLE ROAD (KY 185) |
| *********** |
| SM- Project | MP01601852601 | CATEGORY NUMBER | 0001 | CATEGORY Description | PAVING |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0300 | DGA BASE | 00001 | 100.000 |
100.000 |
$50.840 |
TON | 0.1 |
| 0305 | LEVELING & WEDGING PG64-22 | 00190 | 50.000 |
50.000 |
$145.470 |
TON | 0.1 |
| 0310 | CL3 ASPH SURF 0.38D PG64-22 | 00339 | 465.000 |
465.000 |
$108.790 |
TON | 1.0 |
| 0315 | TEMPORARY SIGNS | 02562 | 150.000 |
150.000 |
$8.080 |
SQFT | 0.0 |
| 0320 | MAINTAIN & CONTROL TRAFFIC (FD05) | 02650 | 1.000 |
1.000 |
$3,291.980 |
LS | 0.1 |
| 0325 | MOBILIZATION FOR MILL & TEXT (FD05) | 02676 | 1.000 |
1.000 |
$1,145.250 |
LS | 0.0 |
| 0330 | ASPHALT PAVE MILLING & TEXTURING | 02677 | 465.000 |
465.000 |
$50.250 |
TON | 0.5 |
| 0335 | EDGELINE RUMBLE STRIPS | 02697 | 6,568.000 |
6,568.000 |
$0.270 |
LF | 0.0 |
| 0340 | PAVE STRIPING-TEMP PAINT-4 IN | 06510 | 3,500.000 |
3,500.000 |
$0.300 |
LF | 0.0 |
| 0345 | PAVE STRIPING-THERMO-6 IN W | 06542 | 6,568.000 |
6,568.000 |
$1.300 |
LF | 0.2 |
| 0350 | PAVE STRIPING-THERMO-6 IN Y | 06543 | 4,950.000 |
4,950.000 |
$1.300 |
LF | 0.1 |
| 0355 | ASPHALT MATERIAL FOR TACK NON-TRACKING | 24970EC | 5.000 |
5.000 |
$626.730 |
TON | 0.1 |
Category Total $112,890.74 |
| SM- Project | MP01601852601 | CATEGORY NUMBER | 0002 | CATEGORY Description | DEMOBILIZATION |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0360 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$24,509.130 |
LS | 0.5 |
Category Total $24,509.13 |